Sunday, February 2, 2014

Moving an electrical outlet and preparing for the electrician.

We're moving...an outlet.
 
January 10th, 2014


Electrician is coming to put in the lights.  I gather all the light fixtures I have been collected from various places over the last year and label them all with the corresponding room they go in and pile them in the living room.  I always use tape on the boxes instead of just writing directly on them in case a light doesn't work and needs to be exchanged or returned to the store.


And then we have this little problem, I mean opportunity.  This outlet was installed too close to the cabinet.  Wouldn't normally be a problem, but we have two more cabinets that stack on top of this one.  So we have to move it over.  Brian has already managed to get the gang box out.


 
Here we mark the new location in pencil. 
 
 
Cut out the drywall.

Put in a new gang box and put a square of drywall in with some drywall clips.
 
 
A little plaster, some primer, and paint and we are in business.

Wednesday, January 22, 2014

Removing the shower pan.

 What a difference an inch makes.
January 9th, 2014


This is the floor of our shower.  It's a shower pan from Onyx. 


It's awesome, except that it is an inch too narrow for the shower door.  Either the guy at the kitchen and bath place ordered it wrong or it was made incorrectly, the jury is still out on that one.  What we do know is that they want it returned to the manufacturer to be fixed.  No problem.

 

Just remove a little drywall. 


A little more...


Keep going... 



There.  Now, to get it to the store.  It only weighs probably close to 200 pounds.  I'll just throw that in the truck.

Hmmm... the shower is looking great.

Dishwasher, electricity, and floors...oh, my

Coming out of the box...
January 5th-8th, 2014



We finally get to take it out of it's box.  The dishwasher, oh how I have missed you.  This was another one of my Black Friday deals.


The electricians are back and we get outlets and light switches.  Oh, you don't realize how much you miss something like electricity until you don't have it.  I have gotten so used to using flashlights at the house that it takes a while to train my brain to use the light switches when I go in a room.


And we get our real heater.  It's much quieter and warmer than the temp.

 And a another box arrives.

 It's a "sample" box of wood flooring.  I ordered one box so that I really get a good look at it and evaluate the quality of a box before ordering the giant wood floor shipment.

And of course I have to unpack the whole box just so I can look at it.  This is really going to warm up the rooms.  We are putting in the wood floors in all the upstairs rooms except the bathrooms, laundry, and the 2nd bedroom.

 I am loving the colors and patterns and the floor has a matte finish so it is not nearly as slippery as the floors in our last house.

Tuesday, January 21, 2014

Installing the wall oven.

Yes, make it a large.

January 5th


I don't know about you, but when I order cabinets and they ask if I want to supersize, I always say, yes.


 I believe this is the largest kitchen cabinet that Ikea sells.  How large is it you ask?  88" x 30"  It's going to house 3 drawers, a wall oven, a microwave, and than some storage above.


This is Seth, my brother-in-law.  He and my sister stopped by to help us lift the wall oven into the cabinet.  Thanks for the help guys, we really appreciate it.


Unpacking the unit.

Remove the oven door and packing materials.


So here we all are, thinking...that shelf is supposed to hold an oven.  That can't be right.  We should really test it out first, don't want to break the new oven.   What could we use that be okay if it fell?


Oh here, let's get Kiffany to test it.  Nothing broke, so we must have a success. 


And tada...team work, wins again.  The gap below the oven will be filled with a trim strip that came with the oven and a small filler strip.  This is our first wall oven.  I am really liking the final height.  I anticipated a complicated install but it really just sits on the shelf and then a few screws to secure it to the cabinet frame in the front.  There is a hole in the back of the shelf that electric cord goes in and the electrician hooked it up behind the drawers.

Tuesday, January 14, 2014

Installing the high cabinets in the kitchen.

Standing in this corner at a staggering 92"...
January 4th


This is the back corner of our kitchen.  Looks sad and empty.


This is an Ikea 88"x 24" high cabinet.  Looks perfect for the job.  We will also be installing a slightly shorter version in the master bath instead of a linen closet, 80".


Here both high cabinets are installed, they are 15" and 24" cabinets.  They will be great for storing large roasters, slow cookers, cheese making supplies, and possibly some food.  We also had the electrician put in an outlet above so we can decorate later, good thing I got the final height right for him, remember we have cabinet, toekick and hardwood floors to account in your measurements.

Monday, January 13, 2014

Kitchen cabinet internal fittings.

What's a gal to do?

January 1-2nd, 2014


So Brian decided to kick the year off by getting the flu. Evidently he wanted to get it out of the way early this year.  So what's a gal to do on a construction site by herself, play with power tools.  I work on putting in the drawer partitions, drawers, and internal fittings in the cabinets.  Here I am putting together a drawer, yes they come in flat boxes and you have to assembly them.


And since I don't have the flu, order pizza.  No, not really this is the parts to the giant lazy susans that go in the corner cabs.


Putting together Ikea cabinets is a lot like a giant puzzle, which I happen to enjoy.  I love putting them together.  But you do need to be prepared there are many, many pieces with Swedish names.  This is the level of detail you are installing, these are the rail holders for the lazy susans.


Here is a finished lazy susan.


And we have internal fittings.  And drawers and drawers and drawers.  I will putting together drawers till spring.  In this picture you can see the rails the drawers will go on that I installed.  I removed the actual drawers so they wouldn't get damaged during the rest of the construction.  Building them was fun, but once is enough.

And then in my spare time, I finish the last coat of paint in the living room and dining area.

Thursday, January 9, 2014

Master bathroom cabinets and sink spacing.

A little to the left, now right, perfect.
December 31, 2013


So the last thing we do in the house for 2013 is dry run the master bath cabinets.  These are the same type of cabinets we put in the kitchen only they will get different door styles and cover panels.  This is a 15" and 24" base cabs.  Now we do use the Ikea legs on these cabs for several reasons:

1.  we are using Ikea's toekicks and they are made to attach to this style of legs
2.  these cabs are against a wall and don't need the extra support
3.  this is a bathroom and the Ikea legs are plastic which is water resistance, wood is not
4.  we had a whole bunch of legs left from our last kitchen install from our last house (anyone need Ikea cabinet legs, contact me)

We are dry running here which means we are not attaching these cabs to the wall yet.  We are figuring out our spacing with the pedestal sinks.  And determining how far we need to bring the sinks forward for comfort.  We will be building out a ledge behind each sink.  This will bring another design feature to the room and provide some bonus storage.