Once Upon an Acre

Tuesday, September 10, 2013


August 30th-  The drain tile goes in.  So this is a drain tile that runs along the inside and outside of the foundation.  Water enters the drain tile through small slits and then drains into our sump pump.  This prevents water from entering the basement.

Posted by Kiffster at 6:40 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2014 (28)
    • ►  July (2)
    • ►  May (1)
    • ►  April (4)
    • ►  February (4)
    • ►  January (17)
  • ▼  2013 (37)
    • ►  December (6)
    • ►  November (8)
    • ►  October (7)
    • ▼  September (16)
      • Vintage shopping, giving the house a little character
      • Framing continues with main floor walls
      • Framing begins
      • Industrial Whisks
      • Garage floor
      • Basement floors are poured.
      • Waterproofing or the grasshopper tar pits
      • It smells like an Ikea store in here.
      • We have outlets.  We have temporary outlets on a...
      • September 10-  Foundation walls are unveil...
      • September 7th-  Foundation walls are poured. ...
      • September 3rd-  Footings are poured.  You can se...
      • August 30th-  The drain tile goes in.  So thi...
      • Digging a hole, digging a big ole hole.  This...
      • August 17th-  Power transformer installed
      • The alfalfa field and so it begins...
Simple theme. Powered by Blogger.